Product Traceability

Batch, serial, and lot-level tracking with full history.

Search by Batch / Serial / Lot

Batch / Item

Batch
BATCH-2025-0042
Product
Point Machine PM-63
Serial
SN-PM-63-00842
Mfg Date
2025-06-10
Expiry / Next Cal.
2027-06-09
Inspection Cert
IC-2024-118

Traceability Timeline

  1. 2025-06-10
    Manufactured
    Siemens plant, Aurangabad
  2. 2025-06-14
    Inspection cleared
    IC-2024-118 issued
  3. 2025-06-25
    GRN GRN-13005
    Received at Kolkata Central WH
  4. 2025-08-02
    Issued to SO-7012
    For DMRC contract
  5. 2025-09-14
    Dispatched via DC-8007
  6. 2025-09-20
    Delivered & installed
    Site: Rithala Depot
  7. 2025-11-01
    Warranty active
    24-month standard